New announcement. Learn more

TAGS

Shop Site Update

Vincent De Paul Tonga, work has already started about last 3 weeks ago with opening of the rock wall from Vuna rd, and they started to excavate the tree trunks around the edges and the area around for the concrete wall for foundation of new shop.  But due to the Heavy Rain and Flash Flood for Tongatapu area, The New Shop site was under water.  

(‘I he uike e 3 kuo maliu atu na’e kamata ai ke fakahoko e fuofua ngaue ki he falekoloa ‘o e kautaha Visesio Paulo ‘i he ‘elia ‘o e ‘api Siasi Katolika, Palokia Ma’ufanga.  Ko e ngaue ni foki ko hono fakaava ‘o e ‘a piliki ‘o e ‘apisiasi ke ngaue’aki mai ai ha hū‘anga ki he falekoloa, pea fakahoko foki mo hono keli ‘o e fakava’e ke tō piliki mo hono sima’i ‘a e tu’u’anga koeni ‘o e falekoloa.  Ka koe me’apango na’e hoko ‘a e ‘uha lahi moe tafea ki he ‘otu Tonga ‘one kapui ai ‘a e konga koeni ‘oku fai ai ‘a e ngaue, ‘i he meimei uike ua.  Pea koe tu’u ‘o e ngaue he taimi ni koe tali pe ke maha atu ‘e vai kae toki hoko atu e ngaue.)